After Action Report/Improvement Plan

Table A.1 Improvement Plan Matrix. The first column is titled "Capability" and has one space titled Capability 1: Capability Name. The second column is titled "Observation Title", and has two spaces. The first space is titles 1. Observation 1. The second space is titled 2. Observation 2. The third column is titled "Recommendation" and has three spaces. The first space is titled 1.1 Insert Recommendation 1. The second space is titled 1.2 Insert Recommendation 2. The third space is titled 2.1 Insert Recommendation 1. The fourth column is titled "Corrective Action Description" and has six spaces. The first space is titled 1.1.1 Insert Corrective Action 1. The second space is titled 1.1.2 Insert Corrective Action 2. The third space is titled 1.2.1 Insert Corrective Action 1. The fourth space is titled 1.2.2 Insert Corrective Action 2. The fifth space is titled 2.1.1 Insert Corrective Action 1. The sixth space is titled 2.1.2 Insert Corrective Action 2. The fifth column is titled "Capability Element" and has six spaces. The first space is titled Planning. The second space is titled Planning. The third space is titled Training. The fourth space is titled Systems/Equipment. The fifth space is titled Planning. The sixth space is titled Systems/Equipment. The sixth column is titled "Primary Responsible Agency" and has six spaces. The first space is titled State X EMA. The second space is titled State X EMS System. The third space is titled State X EMA. The fourth space is titled State X EMA. The fifth space is titled State X EMS System. The sixth space is titled State X EMA. The seventh column is titled "Agency POC" and has six spaces. The first space is titled EMA Director. The second space is titled EMS System Director. The third space is titled EMA Director. The fourth space is titled EMA Director. The fifth space is titled EMS System Director. The sixth space is titled EMA Director. The eighth column is titled "Start Date" and has six spaces. The first space is titled December 1, 2006. The second space is titled December 1, 2006. The third space is titled December 1, 2006. The fourth space is titled December 1, 2006. The fifth space is titled December 1, 2006. The sixth space is titled December 1, 2006. The ninth column is titled "Completion Date" and has six spaces. The first space is titled September 1, 2007. The second space is titled February 1, 2007. The third space is titled January 1, 2007. The fourth space is titled March 15, 2007. The fifth space January 15, 2007. The sixth space is titled January 1, 2007.


Base Plan

A bulleted list of the base plan. Under Introductory Material, it lists: Promulgation Document/Signatures, Approval and Implementation, Record of Changes, Record of Distribution, and Table of Contents. Under Purpose, Scope, Situation Overview, and Assumptions, it lists: Purpose, Scope, Situation Overview (Hazard Analysis Summary, Capability Assessment, Mitigation Overview), and Planning Assumptions. The rest of the bulleted list includes: Concept of Operations; Organization and Assignment of Responsibilities; Direction, Control, and Coordination; Information Collection, Analysis, and Dissemination; Communications; Administration, Finance, and Logistics; Plan Development and Maintenance; and Authorities and References. 


Functional Annexes

A bulleted list of functional annexes. A note underneath the title reads: Not a complete list; core functions will vary by jurisdiction. The list includes: Agriculture and Natural Resources; Communications; Continuity; Direction, Control and Coordination; Energy; Financial Management; Firefighting; Hazardous Materials; Law Enforcement; Logistics and Resource Management; Mass Care; Mutual Aid/Multijurisdictional Coordination; Private Sector Coordination; Protective Actions; Public Alert and Warning; Public Health and Medical Services; Public Information; Public Works and Engineering/Infrastructure Restoration; Recovery; Search and Rescue; Transportation; Volunteer and Donations Management; and Worker Safety and Health.


Threat- or Hazard-Specific Annexes

A list of Threat- or Hazard-Specific Annexes. A note says: Not a complete list; annexes will vary based on jurisdiction's hazard analysis. The list includes: Biological Incident, Earthquake, Flood, Hurricane/Severe Storm, Tornado, Dam and Levee Emergency, Hazardous Materials Spill, Radiological Incident, Cyber Incident, and Terrorism.


Developing and Maintaining Emergency Operations Plans

A numbered flow chart of the planning process. Number 1 is Form a Collaborative Planning Team. A list under it says Identify core planning team, and Engage the whole community in planning. Number 2 is Understand the Situation. A list under it says: Understand risk, and Use the results of risk analysis. Number 3 is Determine Goals and Objectives. A list under it says: Determine operational priorities, and Set goals and objectives. Number 4 is Develop the Plan. A list under it says: Develop and analyze courses of action, Identify resources, and Identify information and intelligence needs. Number 5 is Prepare and Review the Plan. A list under it says: Write the plan, Review the plan, and Approve and disseminate the plan. Number 6 is Implement and Maintain the Plan. A list under it says: Train on the plan; Exercise the plan; and Review, revise and maintain the plan. 